Gemini OWF

Provided cable installation and engineering expert support to Van Oord Offshore Wind Projects, including follow-up of installation vessel and project team activities, and assistance in resolving critical operational issues.
Contributed to the development of internal engineering processes, cable installation and burial guidelines, and mechanical standards and testing procedures.

Beatrice OWF

Delivered Pre-FEED stage support on the Beatrice project for Subsea 7 (client: SSE).

Isla Margarita Interconnector Project

Provided engineering, management, and offshore supervision expertise to Oceanus and LS Cable during the Isla Margarita HVDC project (client: Corporelec).
Responsibilities included:Supervising and managing offshore operations during project execution off the coast of Venezuela; Managing the conversion and sea trials of the installation vessel in Korea; Supervising cable loading operations; Supporting installation analysis reviews, QA/QC, and procedural validation.

Vertiwind Floating OWF

Provided installation engineering support to Technip France for the offshore installation and connection of the Vertiwind and Inflow Floating Vertical Axis Wind Turbines.
Developed installation principles and philosophy for the floating platform mooring system and dynamic subsea power cable.